The existing deteriorated timber walkway along the shoreline was dismantled and removed.  The steel bulkhead was cut off above the mean tide level and a concrete cap walkway was installed.  The ground behind the concrete cap was cut and shaped to provide a gentle slope from the existing ground level to the concrete walkway while it ensured handicap accessibility is maintained.  A chain link fence and handrail were installed at the water's edge along the walkway to ensure pedestrian and angler safety.

 