Beach Monitoring and Maintenance Plan Cycle 12

Project Description

2022 round (Phase 12) of annual beach monitoring profile surveys in accordance with the GLO Beach Monitoring and Maintenance Plan-BMMP. Tasks include beach profile surveys, analysis and reporting plus updates and enhancements to the online data visualization system (CHRGIS). A fourth optional task will be the integration of third-party post-storm survey data provided by the GLO in the event that post-storm surveys are required and obtained by the GLO from a third-party Provider during the 2021 Atlantic tropical storm season.

Basics

Coast Wide

Classification

Study
  • CEPRA
Planning

Contacts

Timeline