City of South Padre Island ADA Beach Access Amenity Engineering

Project Description

The project will produce three finalized engineering plans for public beach access improvements. These include (1) Harbor Circle with the restructuring of an emergency drive-over, ADA dune walkover, ADA parking, and permanent restrooms; (2) Bluewater Circle with an ADA dune walkover, permanent restrooms, rinse stations, additional parking, and ADA pathways, and (3) Day Dream Circle with the installation of an ADA dune-walkover, rinse stations, and additional parking.

Basics

Cameron

Classification

  • CMP 306A
Public Access

Contacts

Timeline