Project Description
This project, conducted in conjunction with Project #1453 under a cooperative agreement with the U.S. Army Corps of Engineers, beneficially used material dredged from the Brazos Santiago Pass to nourish over a mile of gulf shoreline beach four to five miles north of the north jetty within the corporate limits of the City of South Padre Island.
Basics
Cameron
Classification
Construction
- CEPRA
Beach Nourishment with Beneficial use of Dredged Material