GIWW-Rollover Bay Reach Beneficial Use of Dredged Material FY2015 & FY2016 events

Project Description

Beach nourishment project beneficially utilizing approximately 171,000 cubic yards of material dredged from the fall-winter 2014 U.S. Army Corps of Engineers maintenance dredging of the Gulf Intracoastal Waterway (GIWW) Rollover Bay Reach and placement along approximately 102,000 linear feet of Caplen Beach just west of Rollover Pass. Work was completed in mid-February 2015.

Basics

Galveston

Classification

Construction
  • CEPRA
Beach Nourishment with Beneficial use of Dredged Material