Gulf Boulevard Beach Access Improvements Phase 3

Project Description

The City of South Padre Island is moving forward with a solution to maximize the use of the entire 75’ Right-of-Way (ROW) of Gulf Boulevard which has not been completely utilized in the past. The number one safety concern for the City is public safety. The current conditions along Gulf Boulevard provide a dangerous environment for vehicular and pedestrian traffic. The City will improve 15% of the entire length of Gulf Boulevard by utilizing the 75’

Basics

Cameron

Classification

  • CMP 306A
Public Access

Contacts

Timeline

2016