Oily Bilgewater Pumpout units - Rockport/Fulton & Port Aransas Harbors

Project Description

The design, manufacture, shipping, installation, and start-up of two (2) Mobile Bilge Pumpout Stations are located at Rockport-Fulton and Port Aransas Harbors. The mobile units are located indefinitely at the two locations.  Each unit consist of a skid-mounted tank and pump designed to pump-out and hold up to 3000 gallons of contaminated bilge water.  The GLO disposed of the contaminated water as part of their existing bilge pumpout and cleanup activities. 

Basics

Aransas

Classification

  • Other
Water Quality Improvement

Contacts

Timeline