Project Description
The project will build upon previous design efforts to protect the shoreline of Indian Point closest to the causeway where erosion continuously affects 1,900 linear feet of shoreline. A shoreline protection structure will be constructed with the potential for marsh restoration behind the protective structure. The project is a cooperative effort between the GLO and The Port of Corpus Christi Authority.
Basics
San Patricio
Classification
Construction
- CEPRA
Shoreline Protection