Preparation, Use and Transportation of Dredged Material in Placement Areas

Project Description

Project funds used to contract with a professional service provider to conduct geotechnical investigations, characterize dredged material placement areas, and develop designs and strategies to remove and transport dredged material with beach quality sand to coastal project locations.

Basics

Coast Wide

Classification

  • CIAP
Planning

Contacts

Timeline

2011