Town of South Padre Island Beach Nourishment/ Park Road 100 Sand Hauling

Project Description

As an interim stabilization measure, 100,000 cubic yards of beach quality sand that had blown onto the Park Road 100 right-of-way were removed and hauled by truck and placed along 2,500 linear feet of the most critical eroding segments of the South Padre Island Gulf beach.

Basics

Cameron

Classification

Construction
  • CEPRA
Beach Nourishment