Project Description
As an interim stabilization measure, 100,000 cubic yards of beach quality sand that had blown onto the Park Road 100 right-of-way were removed and hauled by truck and placed along 2,500 linear feet of the most critical eroding segments of the South Padre Island Gulf beach.
Basics
Cameron
Classification
Construction
- CEPRA
Beach Nourishment