Project Description
This project includes the analysis and further development of the proposed shoreline stabilization alternative, concrete-filled barge breakwaters, for the West Galveston Island Shoreline Stabilization Demonstration Project along the Gulf of Mexico, and preliminary design of the preferred alternative. The project shoreline starts at 8-Mile Rd. on the northeast portion and ends at the southwestern terminus of Beachside Dr., extending approximately 0.9 miles in length.
Basics
Brazoria
Classification
Demonstration
- CEPRA
Planning
Contacts
Timeline
2014