Indian Point Causeway Shoreline Protection

Project Description

The project will build upon previous design efforts to protect the shoreline of Indian Point closest to the causeway where erosion continuously affects 1,900 linear feet of shoreline. A shoreline protection structure will be designed with the potential for marsh restoration behind the protective structure. The project is a cooperative effort between the GLO and The Port of Corpus Christi Authority.

Basics

Nueces

Classification

Alternative Analysis
  • CEPRA
Shoreline Protection

Contacts

Timeline

2022