The goal of this project is to restore habitat function to this portion of the preserve and to stabilize the entire shoreline to prevent future loss along Jones Bay, likely utilizing a combination of permanent hard structure breakwaters designed to col
The purpose of the project is to construct additional nature park amenities that will significantly enhance public access to coastal habitats, provide educational outreach components, and create, enhance, and expand important coastal barrier island wil
Nueces County Coastal Parks Department (the County) will improve Packery Channel Park by constructing a resilient living shoreline to fight erosion and a raised pier structure to enhance public access.
Coastal Bend Bays & Estuaries Program (CBBEP) will replace missing and damaged portions of the vehicular barrier (bollards), install signage, and preform minor repairs to two parking areas and one public access trail.
The City of Palacios will construct a new pavilion to be utilized as a multi-use venue that can help revitalize Palacios, reestablish a historic community icon, serve as a community venue, promote education, and enhance tourism.
A 350 linear foot fishing pier was constructed in South Bay Park to foster ecotourism. The pier was constructed with treated timber has a 7-1/2 foot wide fishing pier with an 11-1/2 foot wide T-head constructed at the end to accommodat
By simulating storm surges hitting a representative portion of the Texas coast, Texas Engineering Experiment Station provided an improved understanding of hurricane surge generation along the Texas coast, a simplified method for estimating surge as a f
This project is seeking to amend two existing Galveston Park Board USACE permits to add upland sand sources. The amended permits will incorporate potential sand sources identified through the Upl
Cameron County will use CMP funds to continue the enhancement of Beach Access #3. This project will include developing architectural designs and constructing a parking area at Beach Access #3.
City of Jamaica Beach will continue construction of the Pathways 2000 community walkways along Jolly Roger Road for a length of one mile, completing the Pathways project.
Pathways 2000, started in 1997 by the City of Jamaica Beach to remedy unsafe conditions when trying to access the beach in the area. This project allowed the City of Jamaica Beach to construct a walkway going north and begin the walkway going sou
The overall objective of this project is to implement components of an integrated farm management program to educate agricultural and turfgrass producers about laws and regulations and on how to better manage their land through safe use of crop protect
Texas A&M University Corpus Christi will coordinate with other Principle Investigators conducting water quality sampling to integrate pesticide sampling into their existing routines. Samples collected will be analyzed for concentrations of le
This project is a step towards the ultimate goal of constructing a Regional Wastewater Treatment Plant and green stormwater infrastructure that would enhance treatment capacity of effluent and nonpoint source stormwater contaminants emanating
The Houston Advanced Research Center will support the CMP in its implementation of Phase 2 of the NCMPMS. The CMP is tasked with implementing the NCMPMS, a program aimed at quantifying the national impact of the CZMA, over three phases.
The Railroad Commission of Texas plugged 5 abandoned wells in state waters off Jefferson County to eliminate a potential threat of pollution to Texas coastal natural resources.
The State of Texas, through the Railroad Commission (RRC), has established an Oil Field Cleanup Fund to plug abandoned wells and clean up abandoned oil and gas properties.
The City of Galveston (the City) will construct a pedestrian path leading from the parking area to the beach and resurface the gravel parking area at Pocket Park #3.
The project will build upon previous design efforts to protect the shoreline of Indian Point closest to the causeway where erosion continuously affects 1,900 linear feet of shoreline.