This project will enlarge the pilot channel from 60- foot wide to a 225-foot wide main channel to provide a higher volume of tidal exchange of approximately 32% and will construct a 30-foot wide northern "Vadia Ancha" channel to provide tidal exc
The objectives of Phase III are to conduct post-construction monitoring of the main channel, control vehicle and pedestrian traffic for public safety and to protect sensitive habitat.
The University of Texas at Austin, Bureau of Economic Geology will conduct a study to 1) provide a baseline from which to monitor the spread of mangroves in the Texas Coastal Bend; 2) establish methods and procedures for mangrove mapping through
The Galveston
Bay Foundation will sponsor Bay Day. This event calls attention to
and celebrates Galveston Bay by providing fun activities for all ages,
increasing public awareness of the bay's
The Galveston Bay Foundation sponsored Bay Day. This event called attention to and celebrated Galveston Bay by providing fun activities for all ages, increasing public awareness of the bay’s value, resources, and diversity of uses.
To increase public awareness and appreciation of the bay, The Galveston Bay Foundation (GBF) and its partners present an all-day celebration of hands-on, interactive exhibits and activities. Event activities will include hands-on learning opportu
The Galveston Bay Foundation will sponsor Bay Day. This event calls attention to and celebrates Galveston Bay by providing fun activities for all ages, increasing public awareness of the bay's value, resources, and diversity of uses.
Bay Day is a one-day celebration presented by the Galveston Bay Foundation (GBF) and numerous community partners. It is a signature education event providing exposure to Galveston Bay for many area residents.
The purpose
of the study is the reduction or elimination of non-source point
pollution, floatables, and other litter entering the marina and Corpus
Christi Bay through several storm water outfalls located along the
seawall.
The TAS/ADA compliant observation deck will be approximately 600 square feet and directly attached to the facility and face Aransas Bay.
A review of successful living shoreline programs will be conducted, identifying challenges and opportunities for application in Texas.
City of
Port Lavaca Port Commission will continue its efforts to revitalize
the bayfront peninsula area by targeting improvements to be constructed
The existing deteriorated timber walkway along the shoreline was dismantled and removed. The steel bulkhead was cut off above the mean tide level and a concrete cap walkway was installed. The ground behind the concrete cap was cut and shape
The goal of the Bayou Preservation Association’s Bayou Riparian Corridor Restoration: Clear Creek project is to complete Phase II (16.5 acres) of an overall project to restore approximately 31.5 acres of riparian forested areas along Clear Creek by rem
Galveston County constructed a multi-purpose trail at Bayshore Spillway Park, as well as place picnic structures, benches, trash receptacles, and educational/interpretive kiosks along the trail. Concrete is the preferred material to comply
The overall goal of the project is to reduce erosion by providing a natural vegetative wave barrier to absorb wave energy, use bluff shaping and planting grasses to reduce impact of waves and bluff retreat, create/restore habitat for wildlife and marin
The City of Baytown will protect and preserve a coastal natural resource area by sprigging a Spartina alterniflora salt marsh between a breakwater and the shoreline for additional erosion control.
Build a web application to deliver data for the updated Beach and Bay Access Guide, now called TxCoasts.com. From fishing and boat ramps to camping and BBQ - the Texas Coast provides a wealth of resources to all visitors.
This project updated the Texas Public Access Inventory and enhance the Texas General Land Office’s (GLO) Texas Beach and Bay Access Guide (BBAG).
2022 round (Phase 12) of annual beach monitoring profile surveys in accordance with the GLO Beach Monitoring and Maintenance Plan-BMMP.